Sinteag Energy patent portfolio

Five technologies. One integrated patent-pending architecture.

The portfolio connects physical systems, operating software, validation, and energy recovery for Silent Zero, with planned application areas for Silent Harbor.

01

Patent-pending technology

GeoSilent-DC

Thermal architecture

An integrated cooling concept connecting sealed liquid cooling, CO2 heat transport, including supercritical-state operation, thermal buffering, heat rejection, and acoustic integration.

Review technology
02

Patent-pending technology

Lunacoustic

Acoustic suppression

A low-frequency noise-control architecture using tuned resonators, mechanical isolation, passive treatment, and active cancellation.

Review technology
03

Patent-pending technology

SentraIQ

Deterministic control software

A physics-based multi-domain control framework intended to coordinate thermal, acoustic, energy, and operating constraints with auditable decision logic.

Review technology
04

Patent-pending technology

Enerdy

Constrained validation software

A multi-agent artificial-intelligence framework for comparing model outputs against domain rules, physical constraints, and consensus thresholds.

Review technology
05

Patent-pending technology

Entropy Harvester

Waste-heat recovery

A modular thermoelectric concept intended to convert moderate-grade waste heat into supplemental electrical output across industrial surfaces and conduits.

Review technology

Filing status

U.S. utility nonprovisional application submitted

On October 20, 2026, U.S. utility nonprovisional application 19/846,269 was submitted for systems and methods spanning thermal management, acoustic suppression, deterministic control, model validation and energy recovery. The application claims benefit of five earlier U.S. provisional applications.

Legal boundary

Submission is not grant or substantive approval

The USPTO acknowledgement evidences receipt of the submitted documents. This site does not state or imply issuance, grant, adjudicated priority, completed assignment, enforceability, or substantive approval.

Technical boundary

Product scope is not performance proof

Architecture and modeled applications require current build records, tests, and project evidence before performance claims are made. Energy savings are design targets, not measured or demonstrated results.

Product inquiries

Discuss the five-technology patent portfolio with Sinteag Energy.